TBM掘进硬岩隧道最小安全覆岩厚度数值模拟研究——以穗莞深城际铁路西宝区间隧道掘进为例
DOI:
作者:
作者单位:

作者简介:

通讯作者:

基金项目:


Numerical Simulation of Minimum Safe Cover Thickness for TBM Tunneling in Hard Rock: Taking Xixiang-Bao,an Tunnel, Guangzhou-Dongguan-Shenzhen Intercity Railway as an Example
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
    摘要:

    采用TBM(隧道掘进机)在硬岩中掘进需要一定的安全覆岩厚度以保持围岩自稳,但安全覆岩厚度过大会增加隧道设计总长度,造成造价上升。因此,研究TBM掘进硬岩隧道最小安全覆岩厚度具有重大工程意义。依托穗莞深城际铁路西乡站—宝安站双模盾构隧道工程案例,通过数值模拟研究不同围岩等级参数下最小安全覆岩厚度的变化规律。结果表明:当采用拱顶位移法模拟时,如果隧道围岩等级为Ⅱ级或Ⅲ级,软土厚度为隧道直径的0~3倍,那么最小安全覆岩厚度则为隧道直径0.2~1.2倍。当采用压力拱法模拟时,如果覆岩等级为Ⅱ级或Ⅲ级,软土厚度为隧道直径的1~3倍,最小覆岩厚度与埋深的比值随着硬岩厚度增加呈现先增大后减小趋势,比值最大为0.39;覆岩等级为Ⅳ级、软土厚度为隧道直径的1~3倍时,最小覆岩厚度与埋深比值始终随着硬岩厚度增加而减小,比值最大为0.42。研究结论可为TBM安全掘进硬岩隧道提供工程指导。

    Abstract:

    The safety cover thickness required for TBM (tunnel boring machine)tunneling in hard rock is such that it is too large to increase the total length of the tunnel design without increasing the cost. Therefore, the study of the minimum safety cover thickness for TBM tunneling in hard rock is of great engineering significance. The Guangzhou-Dongguan-Shenzhen Intercity Railway Xixiang Station - Bao'an Station double-mode shield tunnel project case was drawn upon to investigate the minimum safe overburden thickness of varying parameters under the condition of changing rock grades. The results indicate that when the arch displacement method is employed, if the tunnel perimeter rock class is II or III, and the thickness of soft soil is between 0 and 3 times the diameter of the tunnel, then the minimum safe rock cover thickness is between 0.2 and 1.2 times the diameter of the tunnel. When the pressure arch method is employed for simulation, if the rock cover class is II or III, and the soft soil thickness is between 1 and 3 times the tunnel diameter, the ratio of the minimum rock cover thickness to the depth of burial exhibits a tendency to increase and then decrease with the increase of the hard rock thickness,reaching a maximum value of 0.39. When the overburden grade is grade IV and the thickness of the soft soil is 1 to 3 times the diameter of the tunnel, the ratio of the minimum rock cover thickness to the depth of burial is observed to decrease with the increase of the hard rock thickness, reaching a maximum value of 0.42. The conclusions can provide engineering guidance for TBMs to safely tunnel through hard rock.

    参考文献
    相似文献
    引证文献
引用本文

梁晓亮,杨宇,刘伟,鄢海涛. TBM掘进硬岩隧道最小安全覆岩厚度数值模拟研究——以穗莞深城际铁路西宝区间隧道掘进为例[J].科技与产业,2025,25(11):40-46