Experimental Analysis on the Deformation of High Fill at Lincang Station
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
    摘要:

    为了研究大临铁路站场的高填方变形,选择典型断面,在高填方体中埋设4排沉降板以及边坡观测桩,在边坡坡脚部位的土工格栅上布设柔性位移计。通过两年多长期观测,发现铁路站场高填方工程经过长达半年多的施工填筑以及竣工后超过12个月的静置,高填方体的沉降趋于稳定。填筑期间所发生的沉降量占总沉降量的最大百分比为69.05%。左、右边坡观测桩的测试结果显示,高填方的边坡也是稳定的,填土期间发生的沉降量占总沉降的最大比例为99.77%。填土结束后,土工格栅的变形基本稳定,说明边坡是稳定的。建议填筑结束后12个月方可开展后续施工。

    Abstract:

    In order to study the deformation of high fill in the Dalin Railway Station, a typical cross-section was selected. Four rows of settlement plates and slope observation piles were buried in the high fill, and flexible displacement meters were installed on the geogrid at the foot of the slope. After more than two years of observation, it was found that after more than half a year of construction and filling, as well as more than 12 months of standing after completion, the settlement of the high fill tended to stabilize. The maximum percentage of settlement during the filling period to the total settlement is 69.05%. The test results of the observation piles on the left and right slopes show that the high fill slope is also stable, and the maximum proportion of settlement during the filling period is 99.77% of the total settlement. After the filling is completed, the deformation of the geogrid is basically stable, indicating that the slope is also stable. It is recommended to carry out subsequent construction 12 months after the completion of filling.

    参考文献
    相似文献
    引证文献
引用本文

吴浩,肖玉林,张春龙,邹华,秦舒桢,李国峰,雷胜友.临沧车站高填方变形的实测分析[J].科技与产业,2025,25(01):30-36

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2025-01-23
×
《科技和产业》
喜报 | 学会期刊《科技和产业》成为国家哲学社会科学文献中心2024年度最受欢迎的经济学期刊