Abstract:In order to ensure the smooth construction of Lugou River Super Large Bridge with 192m super high pier, BIM technology and integrated high-efficiency construction platform are applied to the construction stage of No. 7 high pier on the left side of Lugou River Super Major Bridge. Firstly, fine modeling is carried out through Revit software.Then, Navisworks software is imported for construction scheme design and animation simulation. The research results show that two problems were found after collision detection and internal three-dimensional analysis. After improvement, it was used in actual construction, and the 192m super high pier was capped 85 days in advance. In addition, Revit software can realize rapid modeling, but when BIM technology is used in actual projects, it should be combined with detailed geological exploration data to ensure the accuracy of design and construction scheme. The integral high-efficiency construction platform after local optimization of the original tower crane can be applied to the construction stage of the super-high pier long-span continuous rigid frame bridge, which can accelerate the construction progress to a certain extent. The research results can provide practical experience for the construction process of super-high pier long-span continuous rigid frame bridge and ensure the smooth construction.