基于资产全寿命周期的500千伏电网规划方案评估
DOI:
作者:
作者单位:

作者简介:

通讯作者:

基金项目:


500 kV Power Network Planning Evaluation With Life Cycle Asset
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
    摘要:

    结合电网规划工作实践,提出适用于本省电网规划的全寿命周期成本模型及计算方法,既考虑电网工程中主要设备从购置、运维到报废的全寿命周期中产生的各项成本,也从系统角度综合考虑全网运行的损耗成本,计及土地的时间价值及外部环境成本。运用其对某省“十二五”主网架滚动规划中的典型案例进行评估,结果表明推荐方案符合全寿命周期管理的理念,相对其他比选方案的全寿命周期成本较优。

    Abstract:

    With practice of power network planning, this paper studied life cycle cost model and calculation method applied to certain provinence. The model considered power enqipment purchase, operation, maintenance cost and discard cost, furthmore, power network loss cost, land opportunity cost, environmental protection cost were also included. LCC evaluation of certain typical power project in “The 12th five-plan” indicated that the recommendation scheme conformed to the idea of life cycle asset management with less life cycle cost.

    参考文献
    相似文献
    引证文献
引用本文

杨娜,葛斐,叶斌,王清.基于资产全寿命周期的500千伏电网规划方案评估[J].科技与产业,2013,(12):153-156

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2014-02-07
×
《科技和产业》
喜报 | 学会期刊《科技和产业》成为国家哲学社会科学文献中心2024年度最受欢迎的经济学期刊