Abstract:This paper measure and calculate the statement of cash flow of the grid ,and Analysis and calculate the payback times of Dynamic investment about the grid project connecting Anhui and other areas for transmission power based on. giving a comprehensive overview about bowth the scale of construction and disposable investment of the grid project connecting Anhui and Huadong for transmission power,baseing on the actual transmission capacity .The result will be a Decision reference on the II period.