投资后评价理论在火电项目竞争力分析中的应用
DOI:
作者:
作者单位:

作者简介:

通讯作者:

基金项目:


Application Analysis of Post Evaluation Theory on Competitiveness of Thermal Power Projects
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
    摘要:

    当前火电项目受“市场煤、计划电”的影响亏损严重,但我国资源禀赋决定了未来一段时间内火电仍将占据重要位置。项目后评价作为投资闭环管理的重要手段,越来越受到投资者重视,本文运用对比分析法对三个同期火电项目进行分析,重点考察电力市场、煤炭市场等因素的变化对于项目经济效益的影响,为新建火电项目的建设提供依据。

    Abstract:

    Affected by the "marketized coal, planned electricity", more and more thermal power plants ara falling into the situation of deficit. However , the resource distribution our country determines that thermal power will still occupy an essential position in China’s electricity generation field in the near future or even longer time. As an important mean of the closed-loop management for investment, post evaluation for projects has become a key measurement in the decision-making stage. The paper comparatively analyze the use of post evaluation theory on 3 selected thermal power projects which are constructed simultaneously, mainly focusing on the power market factors that greatly influence the economic benefits of the projects. The analysis result will provide theoretical basis for subsequent thermal power project construction.

    参考文献
    相似文献
    引证文献
引用本文

段百齐,王虎齐,伍磊.投资后评价理论在火电项目竞争力分析中的应用[J].科技与产业,2012,(11):97-100

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2013-03-10
×
《科技和产业》
喜报 | 学会期刊《科技和产业》成为国家哲学社会科学文献中心2024年度最受欢迎的经济学期刊