    摘要:

    现有的地基承载力特征分析模型没有建立地基承载力的边界条件,导致模型的数值模拟结果与实际测量情况误差较大。因此,在远景施工影响下,以北京市大兴变电站为例设计变电站地基承载力特征分析方法,为综合施工方法提供保障。计算岩土力学特征参数,分析岩土微粒与周边应力的关联,将其分为光滑面与粗糙面,分别计算地基两侧土体力学特性,经多点交叉建立地基承载力边界条件,构建变电站承载力数学模型,计算区域地基承载力上限,匹配综合施工方法。实验结果表明:实验组得到的数值模拟结果与实际数值的误差约为11.35%,准确性较高;实验组的总费用为73 646万元,施工方法的建设费用较少,远景施工影响下的变电站地基承载力特征分析及综合施工方法的实际应用效果较好。

    Abstract:

    The existing foundation bearing capacity characteristic analysis model does not establish the boundary conditions of foundation bearing capacity, which leads to the large error between the numerical simulation results and the actual measurement. Therefore, under the influence of long-term construction, taking Beijing Daxing Substation as an example, a method for analyzing the bearing capacity characteristics of the substation foundation is designed to provide guarantees for comprehensive construction methods. The geotechnical mechanical characteristic parameters are calculated, and the correlation between geotechnical particles and surrounding stress is analyzed. It is divided into smooth surface and rough surface. The mechanical characteristics of soil on both sides of the foundation is respectively calculated, the boundary conditions of foundation bearing capacity are established through multi-point intersection. The mathematical model of substation bearing capacity is constructed, the upper limit of regional foundation bearing capacity is calculated, and the comprehensive construction method is matched. The experimental results show that the error between the numerical simulation results obtained by the experimental group and the actual values is about 11.35%.The total cost of the experimental group is 736.46 million yuan, and the construction cost of the construction method is less. The analysis of the bearing capacity characteristics of the substation foundation under the influence of long-term construction and the practical application effect of the comprehensive construction method are better.

    参考文献
    相似文献
    引证文献
引用本文

肖成.远景施工影响下的变电站地基承载力特征分析及综合施工方法——以北京市大兴变电站为例[J].科技与产业,2024,24(05):233-238

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2024-03-29